Our Sectors

Abunayyan Holding addresses complex manufacturing and operational challenges with bold thinking and industry insights. Our end-to-end services and global capabilities enable us to deliver innovative and effective solutions across five integrated sectors.

Solar power delivered
0 GW
Desalination capacity
0 m³/day
Water reused daily
0 M L/day
RO membranes produced
0 K / yr
The lifecycle

Every sector moves through the same closed loop

Five stages, and the fifth returns to the first: whoever operates the asset knows what the next project needs. That return is why a client contracts one accountable party instead of fifteen suppliers.

ST-05 → ST-01 ONE PROJECT One party accountable end to end ST-01 Design ST-02 Supply ST-03 Manufacture ST-04 Execute ST-05 Operate
ST-01
Engineering & EPCM
Design

WETICO · DCT · IICS · Citiscape · Arabian Qudra

ST-02
Trading & Services
Supply

Abunayyan Trading · KSB Arabia · Eaton Arabia · IWAC · HolyStar

ST-03
Local Manufacturing
Manufacture

Toray ME · Saudi Meters · Eaton Arabia · ABCI · NextPower · Plime · WETICO

ST-04
Engineering & EPCM
Execute

WETICO · Abunayyan Trading · DCT · Citiscape · IWAC · Arabian Qudra

ST-05
Trading & Services
Operate & maintain

Abunayyan Trading · KSB Arabia · IICS · MEAC · Citiscape · SIS

What you actually contract for

Each sector below carries the scope it can be held to, and the companies that deliver it. The delivered projects behind each one are listed further down.

Water & Environment

The founding sector and the deepest one. Desalination, sewage and wastewater treatment, reuse, membranes, pumps, irrigation and landscape — engineered, manufactured in the Kingdom, built, and then operated for as long as the asset runs.

Scope you can contract for
Seawater desalination (SWRO)
Brackish water (BWRO)
Sewage treatment
Water reuse (TSE)
RO membranes
Pumps & mechanical
Landscaping & greening
Irrigation & drainage
Water chemicals
Plant O&M

Delivered by

Energy & Power

Solar EPC and trackers, storage, electrical systems and smart distribution, energy audits and ESCO performance contracts. Most of a solar field or a substation is manufactured before it reaches site, which is where this sector’s weight sits.

Scope you can contract for
Solar EPC
Hybrid solar & storage
Solar trackers
Electrical panels & E-Houses
Smart distribution
Energy audits & M&V
ESCO contracts
Transformer maintenance
Power O&M

Delivered by

Data Centers

Facility EPCM across the full lifecycle, critical power and smart distribution, and the SCADA and controls layer above them. The newest sector, entered with the power and controls engineering the other two spent decades building.

Scope you can contract for
Data-center EPCM
Plan · design · build · operate
Electrical systems
Uninterruptible power
SCADA · DCS · MES
OT cybersecurity
Smart metering
Facilities management
Managed services (SLA)

Delivered by

Delivered projects across the group

Each project names the sector it belongs to, the capacity it runs at, the client it serves, and the group companies that carried it — the same five stages, applied to real sites.

Water · Rabigh, KSA

Rabigh 4 IWP

600,000 m³/day

Serving more than three million people on the Red Sea coast.

Client not stated in source
WETICO · Toray ME · KSB · IWAC

Water · Riyadh, KSA

King Salman Park

192M liters/day

Treated water reuse for the world’s largest urban park, with a 28M liters/day plant alongside it.

Client not stated in source
WETICO

Water · Béjaïa, Algeria

Béjaïa SWRO

300M liters/day

The group’s largest international water reference.

Not stated in source
WETICO

Water · Diriyah, KSA

Diriyah Gate WWTP

42M liters/day

Food Chain Reactor technology inside a heritage site — design through operation in one company.

Client not stated in source
WETICO

Energy & Power · Bisha, KSA

Bisha Solar

2.25 GW

Project total; the company’s scope within it is not specified in the source.

Not stated in source
NextPower Arabia

Energy & Power · NEOM, KSA

NEOM crossings

Hybrid first

The first hybrid solar-plus-storage reference in the Kingdom.

NEOM
Arabian Qudra

Energy & Power · Kingdom-wide

MOI security facilities

370 sites

Seventy three-phase UPS systems for critical low-current and data-center loads.

Ministry of Interior
Abunayyan Trading

Data Centers · Makkah & the Mashaer

Makkah Central SCADA

Remote control

Converting Hajj-period utility operation to remote monitoring and control.

National Water Company
Abunayyan Trading · IICS

Data Centers · Kingdom-wide

MOW national metering

200,000 meters

Cut manual meter-reading time by 60% across the national network.

Ministry of Water
Abunayyan Trading
On the record

Capacities and delivering companies come from the group’s own records. Client names are shown only where those records confirm them.

Who we build for

National utilities, ministries, giga-projects and industrial groups — the clients whose infrastructure has to work every day.

Saudi Aramco
SWCC
National Water Company
Ministry of Water
Ministry of Environment, Water & Agriculture
Ministry of Interior
Ministry of Health
GACA
GOSI
Saudi Electricity Company
Marafiq
NEOM
Red Sea Global
ROSHN
Diriyah Gate
King Salman Park
Ma’aden
MODON
Qassim Municipality
Yanbu Municipality

16

Countries with delivered water projects

4

Countries of direct operation: KSA, UAE, Bahrain, Qatar

370

Ministry of Interior sites served in one program

60%

Cut in manual meter-reading time, Ministry of Water

The projects that belong to more than one sector

A desalination plant needs power. A data hall needs cooling water. These are the scopes that normally require three contracts and produce two arguments.

Water
Energy

A plant is also a power problem

Desalination is one of the most energy-intensive processes in the Kingdom. Buying the plant and its electrical systems from the same group means the load and the supply are designed against each other, not negotiated afterwards.

WETICO · Eaton Arabia · Arabian Qudra
Water
Data Centers

A network you cannot visit is a controls problem

Metering, SCADA and remote operation turn a distribution network into something that can be run from a room. Makkah during the Hajj is the proof — the same layer a data hall needs.

IICS · Saudi Meters · Abunayyan Trading
Energy
Data Centers

A data hall is critical power around white space

Facility EPCM, uninterruptible power, smart distribution and the service agreement that keeps them running. Three sectors’ worth of engineering, contracted once.

DCT · Eaton Arabia · SIS

How we work

How We Deliver

Five stages, one accountable party, and who carries each step.

In the Kingdom

Local Manufacturing

Eleven plants in seven industrial cities — the part is a drive, not a shipment.