Abunayyan Holding addresses complex manufacturing and operational challenges with bold thinking and industry insights. Our end-to-end services and global capabilities enable us to deliver innovative and effective solutions across five integrated sectors.
Five stages, and the fifth returns to the first: whoever operates the asset knows what the next project needs. That return is why a client contracts one accountable party instead of fifteen suppliers.
ST-01
Engineering & EPCM
Design
WETICO · DCT · IICS · Citiscape · Arabian Qudra
Each sector below carries the scope it can be held to, and the companies that deliver it. The delivered projects behind each one are listed further down.
Water & Environment
The founding sector and the deepest one. Desalination, sewage and wastewater treatment, reuse, membranes, pumps, irrigation and landscape — engineered, manufactured in the Kingdom, built, and then operated for as long as the asset runs.
Scope you can contract for
Seawater desalination (SWRO)
Brackish water (BWRO)
Sewage treatment
Water reuse (TSE)
RO membranes
Pumps & mechanical
Landscaping & greening
Irrigation & drainage
Water chemicals
Plant O&M
Delivered by
Explore Water & Environment
Energy & Power
Solar EPC and trackers, storage, electrical systems and smart distribution, energy audits and ESCO performance contracts. Most of a solar field or a substation is manufactured before it reaches site, which is where this sector’s weight sits.
Scope you can contract for
Solar EPC
Hybrid solar & storage
Solar trackers
Electrical panels & E-Houses
Smart distribution
Energy audits & M&V
ESCO contracts
Transformer maintenance
Power O&M
Delivered by
Explore Energy & Power
Data Centers
Facility EPCM across the full lifecycle, critical power and smart distribution, and the SCADA and controls layer above them. The newest sector, entered with the power and controls engineering the other two spent decades building.
Scope you can contract for
Data-center EPCM
Plan · design · build · operate
Electrical systems
Uninterruptible power
SCADA · DCS · MES
OT cybersecurity
Smart metering
Facilities management
Managed services (SLA)
Delivered by
Explore Data Centers
Delivered projects across the group
All projects & news
Each project names the sector it belongs to, the capacity it runs at, the client it serves, and the group companies that carried it — the same five stages, applied to real sites.
Water·Rabigh, KSA
Rabigh 4 IWP
600,000 m³/day
Serving more than three million people on the Red Sea coast.
Client not stated in source
WETICO · Toray ME · KSB · IWAC
Water·Riyadh, KSA
King Salman Park
192M liters/day
Treated water reuse for the world’s largest urban park, with a 28M liters/day plant alongside it.
The group’s largest international water reference.
Not stated in source
WETICO
Water·Diriyah, KSA
Diriyah Gate WWTP
42M liters/day
Food Chain Reactor technology inside a heritage site — design through operation in one company.
Client not stated in source
WETICO
Energy & Power·Bisha, KSA
Bisha Solar
2.25 GW
Project total; the company’s scope within it is not specified in the source.
Not stated in source
NextPower Arabia
Energy & Power·NEOM, KSA
NEOM crossings
Hybrid first
The first hybrid solar-plus-storage reference in the Kingdom.
NEOM
Arabian Qudra
Energy & Power·Kingdom-wide
MOI security facilities
370 sites
Seventy three-phase UPS systems for critical low-current and data-center loads.
Ministry of Interior
Abunayyan Trading
Data Centers·Makkah & the Mashaer
Makkah Central SCADA
Remote control
Converting Hajj-period utility operation to remote monitoring and control.
National Water Company
Abunayyan Trading · IICS
Data Centers·Kingdom-wide
MOW national metering
200,000 meters
Cut manual meter-reading time by 60% across the national network.
Ministry of Water
Abunayyan Trading
On the record
Capacities and delivering companies come from the group’s own records. Client names are shown only where those records confirm them.
Who we build for
National utilities, ministries, giga-projects and industrial groups — the clients whose infrastructure has to work every day.
Saudi Aramco
SWCC
National Water Company
Ministry of Water
Ministry of Environment, Water & Agriculture
Ministry of Interior
Ministry of Health
GACA
GOSI
Saudi Electricity Company
Marafiq
NEOM
Red Sea Global
ROSHN
Diriyah Gate
King Salman Park
Ma’aden
MODON
Qassim Municipality
Yanbu Municipality
16
Countries with delivered water projects
4
Countries of direct operation: KSA, UAE, Bahrain, Qatar
370
Ministry of Interior sites served in one program
60%
Cut in manual meter-reading time, Ministry of Water
The projects that belong to more than one sector
A desalination plant needs power. A data hall needs cooling water. These are the scopes that normally require three contracts and produce two arguments.
Water
Energy
A plant is also a power problem
Desalination is one of the most energy-intensive processes in the Kingdom. Buying the plant and its electrical systems from the same group means the load and the supply are designed against each other, not negotiated afterwards.
WETICO · Eaton Arabia · Arabian Qudra
Water
Data Centers
A network you cannot visit is a controls problem
Metering, SCADA and remote operation turn a distribution network into something that can be run from a room. Makkah during the Hajj is the proof — the same layer a data hall needs.
IICS · Saudi Meters · Abunayyan Trading
Energy
Data Centers
A data hall is critical power around white space
Facility EPCM, uninterruptible power, smart distribution and the service agreement that keeps them running. Three sectors’ worth of engineering, contracted once.
DCT · Eaton Arabia · SIS
How we work
How We Deliver
Five stages, one accountable party, and who carries each step.