Fifteen suppliers, or one signature.

A single plant needs every discipline on this page. Bought separately, each one is a contract you sign and an interface you own. Bought through the group, the interfaces move inside.

The five stages
Closed — 05 returns to 01
0 stages
Business lines behind the stages
0 lines
Interfaces the client has to own
0

Five stages, and the fifth feeds the first

Select a stage to see who carries it, which business line stands behind it, and what happened at that step on Rabigh 4 — the group’s largest water project.

Engineering & EPCM
Local Manufacturing
Trading & Services
ST-05 returns to ST-01
Stage 01 Engineering & EPCM

Design

The asset is engineered against the real site — capacity, footprint, discharge limits and the operating plan settled together rather than in sequence.

Stage 02 Trading & Services

Supply

Equipment, logistics and site supply, procured through companies that also service what they sell for as long as it runs.

Companies that carry this stage
Abunayyan Trading KSB Arabia Eaton Arabia IWAC HolyStar Arabia
Stage 03 Local Manufacturing

Manufacture

Membranes, meters, panels, trackers, chemicals and filtration made across eleven plants in seven Saudi industrial cities — the stage the other four lean on.

Companies that carry this stage
Toray Membrane ME Saudi Meters Eaton Arabia ABCI NextPower Arabia Plime WETICO
Stage 04 Engineering & EPCM

Execute

Installation and commissioning, with the mechanical, electrical and landscape scopes carried by companies already on the drawing.

Companies that carry this stage
WETICO Abunayyan Trading DCT Citiscape IWAC Arabian Qudra
Stage 05 Trading & Services

Operate & maintain

Long-term operation, maintenance and facilities management — the stage that decides whether the capacity on paper is the capacity delivered, and the one that briefs the next project.

Companies that carry this stage
Abunayyan Trading KSB Arabia IICS MEAC Citiscape SIS

How far each company reaches

Every company drawn as a span across the five stages. The widest bars carry a project almost end to end; the narrowest do one thing and do it as their whole business. Filter by sector to see who is left standing.

Company
ST-01Design
ST-02Supply
ST-03Manufacture
ST-04Execute
ST-05Operate & maintain
Sectors
WETICOWater and wastewater treatment plants
01
03
04
CitiscapeLandscaping, irrigation and urban greenery
01
04
05
Abunayyan TradingConstruction, logistics, supply and long-term O&M
02
04
05
IICSAutomation, SCADA and digital transformation
01
05
Arabian QudraSolar, energy efficiency and electrical projects
01
04
DCTData center technology and facility EPCM
01
04
KSB ArabiaJV · KSBPumps and mechanical solutions
02
05
IWACHVAC and ventilation
02
04
Eaton ArabiaJV · EatonElectrical systems and smart distribution
02
03
NextPower ArabiaJV · NextPowerSolar tracker systems
03
04
HolyStar ArabiaJV · HolyStarSmart power distribution systems
02
Toray Membrane MEJV · TorayRO membranes, made in Dammam
03
Saudi MetersSmart metering and measurement
03
PlimeFiltration and separation for water, oil and gas
03
ABCIJV · Advanced BioCatalyticsGreen specialty chemicals
03
MEACIrrigation and agricultural water solutions
05
SISJV · IREPIntegrated facilities management
05
Companies at each stage
5of 17
5of 17
7of 17
7of 17
6of 17
17 of 17 shown
Companies at each stage
3of 11
3of 11
4of 11
4of 11
6of 11
11 of 17 shown
Companies at each stage
2of 10
3of 10
5of 10
3of 10
3of 10
10 of 17 shown
Companies at each stage
2of 5
2of 5
1of 5
2of 5
3of 5
5 of 17 shown

Most groups buy the manufactured parts. This one makes them.

Every other stage draws on stage 03.. Below is what leaves the plants — which is why a membrane or a panel is a drive, not a shipment.

11

plants in seven industrial cities

225,632

m² of plant floor, running since 1980

What leaves the plantOutput on recordMade at
RO membranesToray Membrane ME300,000membranes a yearDammam, 3rd Industrial City
Specialty chemicalsABCI25,000metric tons a yearDammam, 2nd Industrial City
Electrical panels & E-HousesEaton Arabia44,492m² plantDammam, 3rd Industrial City
Solar tracker systemsNextPower Arabia51,600m² across two plantsJeddah 3rd & Al-Kharj
Pumps & mechanical packagesKSB Arabia20,000m² plantRiyadh, 2nd Industrial City
Filtration & separationPlime20,000m² plantRabigh / Petro Rabigh
Smart power distributionHolyStar Arabia10,000m² plantRiyadh, Al-Fawzan
Smart meters & measurementSaudi Meters7,500m² plantRiyadh, 2nd Industrial City
On the record

Two lines publish a rated annual output. For the rest the group’s documents give plant area only, so that is what is shown rather than an estimate.

When it has actually run end to end

One project names four companies against its steps. The rest name a single company carrying the whole scope — which is the same argument from the other side. Nobody is credited here who is not credited in the group’s documents.

Water · Rabigh, KSA

Rabigh 4 IWP

600,000 m³ / day

The one project whose record names a company per step — for three of the five stages. Design and operation have no company recorded and are left unclaimed.

Four companies named
WETICO · Toray Membrane ME · KSB Arabia · IWAC

Water · Diriyah, KSA

Diriyah Gate WWTP

42M litres / day

The same argument from the other side: one company held every stage, using Food Chain Reactor technology inside a heritage site.

One company, all stages
WETICO — design through operation

Water · Riyadh, KSA

King Salman Park

192M litres / day

Treatment and reuse designed as a single water balance and operated by the company that designed it — 28M litres a day treated alongside it.

One company, all stages
WETICO — treatment plant and reuse system

Data Centers · Makkah & the Mashaer

Makkah Central SCADA

Hajj-period control

Utility operation across Makkah and the Mashaer converted to remote monitoring and control for the National Water Company.

One company, all stages
Abunayyan Trading — supply, delivery and remote control

Our Sectors

Water, energy and data centres — and the eleven companies that deliver them.

Local Manufacturing

Eleven plants in seven industrial cities — the part is a drive, not a shipment.